PII » PII Deliverables http://pii.tssg.org PII.tssg.org Thu, 15 Nov 2012 16:53:02 +0000 en-US hourly 1 http://wordpress.org/?v=3.9.1 D3.7 Implementation Report http://pii.tssg.org/2010/08/02/d3-7-implementation-report/ http://pii.tssg.org/2010/08/02/d3-7-implementation-report/#comments Mon, 02 Aug 2010 10:08:07 +0000 http://pii.tssg.org/2010/08/02/d3-7-implementation-report/ Continue reading ]]> This is the final deliverable in the Service Description, Discovery and Orchestration work package of PII. This document reports on the extensive implementation efforts realized in WP3 delivering a functional Teagle framework.
In particular, this document serves as the implementation report and, together with the PII WIKI (http://trac.panlab.net/trac/), as documentation for the Teagle prototype. The document lists the details around the Teagle framework implementation that consists of several internal components, e.g. the Portal, the Repository, the Orchestration Engine and others.
Overall, the implementation of a feature-rich Teagle framework was delivered in a reasonable timeframe supporting the other project work packages such as WP5 and WP1.

]]>
http://pii.tssg.org/2010/08/02/d3-7-implementation-report/feed/ 0
D4.2 Monitoring requirements and procedures for service level agreement compliance http://pii.tssg.org/2009/12/09/d4-2-monitoring-requirements-and-procedures-for-service-level-agreement-compliance/ http://pii.tssg.org/2009/12/09/d4-2-monitoring-requirements-and-procedures-for-service-level-agreement-compliance/#comments Wed, 09 Dec 2009 09:54:38 +0000 http://pii.tssg.org/2009/12/09/d4-2-monitoring-requirements-and-procedures-for-service-level-agreement-compliance/ Continue reading ]]> D4.2 is the second deliverable produced from the Quality Assurance work package of PII.
This deliverable comprises the functional specification of Panlab’s quality assurance framework and is part II in a series of three documents produced by WP4 specifying metrics and processes for quality assurance in the PII framework.
This document defines architectural extensions for technical contract assurance and covers metrics for resource assessment, ITIL based processes for IT management in Panlab, security policies for testbed providers and quality management for business development for the Panlab federation.

]]>
http://pii.tssg.org/2009/12/09/d4-2-monitoring-requirements-and-procedures-for-service-level-agreement-compliance/feed/ 0
D3.2 Testbed Service Description Specification http://pii.tssg.org/2009/03/29/d3-2-testbed-service-description-specification/ http://pii.tssg.org/2009/03/29/d3-2-testbed-service-description-specification/#comments Sun, 29 Mar 2009 09:45:28 +0000 http://pii.tssg.org/2009/03/29/d3-2-testbed-service-description-specification/ Continue reading ]]> Deliverable 3.2 Testbed Service Description Specification comprises of the specification of the service description system and is part of the specification of Teagle.
It breaks down the requirements from Task 3.1 into technical requirements for the specification of the testbed services description system. The specification will be linked closely with the architecture work developed in task T2.1. Develop an advanced service description system based on the requirements and the specification. Implement the core functionalities of the description system.

]]>
http://pii.tssg.org/2009/03/29/d3-2-testbed-service-description-specification/feed/ 0
D3.1r Revised System Analysis http://pii.tssg.org/2009/03/02/d3-1r-revised-system-analysis/ http://pii.tssg.org/2009/03/02/d3-1r-revised-system-analysis/#comments Mon, 02 Mar 2009 10:12:02 +0000 http://pii.tssg.org/2009/03/02/d3-1r-revised-system-analysis/ Continue reading ]]> This deliverable is a revised list of the Panlab Community testbeds that form the surrounding ecosystem and represent the potential Panlab Partner testbeds.
Furthermore, resources from those testbeds that provide components for the September 2009
demonstration are described with the technical means (UML) used by the Teagle components.

]]>
http://pii.tssg.org/2009/03/02/d3-1r-revised-system-analysis/feed/ 0
D2.1 Technical Infrastructure Specification http://pii.tssg.org/2009/01/17/d2-1-technical-infrastructure-specification/ http://pii.tssg.org/2009/01/17/d2-1-technical-infrastructure-specification/#comments Sat, 17 Jan 2009 16:16:39 +0000 http://pii.tssg.org/2009/01/17/d2-1-technical-infrastructure-specification/ This D2.1 Technical Infrastructure Specification is the first deliverable produced from the Technical Infrastructure work package of PII. It describes the mechanisms that will allow the development of a common layered architecture featuring compatible interfaces for services configuration and execution.

]]>
http://pii.tssg.org/2009/01/17/d2-1-technical-infrastructure-specification/feed/ 0
D3.1 System Analysis Report http://pii.tssg.org/2008/11/27/d3-1-system-analysis-report/ http://pii.tssg.org/2008/11/27/d3-1-system-analysis-report/#comments Thu, 27 Nov 2008 17:04:29 +0000 http://pii.tssg.org/2008/11/27/d3-1-system-analysis-report/ Continue reading ]]> This deliverable (D3.1 System Analysis Report) is the first to be produced from the Service Description, Discovery and Orchestration work package of PII.
The project Pan European Laboratory Infrastructure Implementation (PII) addresses the need for large-scale testing facilities in the communications area by implementing an infrastructure for federating testbeds among innovations clusters. It builds upon the Panlab Specific Support Action which received funding by the European Commission’s Sixth Framework Programme. This document analyses the existing testbeds hosted by PII partner organizations. These testbeds are the foundation of the PII federation and represent the available infrastructure.

]]>
http://pii.tssg.org/2008/11/27/d3-1-system-analysis-report/feed/ 0