« PII 2nd Plenary Meeting | Main | D3.1 System Analysis Report »

PII 2nd Plenary Meeting : Update

Both Eamonn and Shane attended the PII 2nd plenary meeting in
Athens – 29 September -1 October 2008

This meeting helped progress and further refine the required TEAGLE tool and PII infrastructure that will support the federation of testbeds in Europe.

Image029.jpg

This meeting took place over a 3 day period with parallel sessions taking place to maximise the time as best as possible. It was a successful meeting which actively worked towards progressing the tasks and activities within panlabs II and keeping the project aligned with the overall PII roadmap schedule for the coming months.

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on October 17, 2008 10:11 AM.

The previous post in this blog was PII 2nd Plenary Meeting.

The next post in this blog is D3.1 System Analysis Report.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.34